Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Dec 2024 |
| Application filed | 24 Sept 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | PrecAUTION PROPERTIES PRIVATE LIMITED |
| Land area | 28 acres (11.3 ha) |
| Project cost | ₹3,800 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17294 |
In context
39 applications in Mumbai since January 2022 are in the same category (Other): 23 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 28 acres, this one is larger than 88% of them.
75 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ Clearance for Construction of Protective Boundary Wall at World Trade… — recommended by coastal authority, 350 m away
- Reconstruction of Existing Staff Quarters at Colaba Pumping Station Plot… — recommended by coastal authority, 500 m away
- CRZ Clearance for Proposed Sludge Treatment and its Conversation into an… — lapsed, 550 m away
- Strengthening of existing anti-sea erosion bund along the High Tide Line (HTL)… — recommended by coastal authority, 800 m away
- Proposed Redevelopment on Plot Bearing C.S. No. 88 of Colaba Division situated… — recommended by coastal authority, 850 m away
- Proposed Protection Works for Fishermen Houses near Shivshastri Nagar at Cuffe… — recommended by coastal authority, 1000 m away
- Environment Impact Assessment Report for Providing Protection work and Public… — recommended by coastal authority, 1 km away
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.