Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 16 Sept 2024 |
| Application filed | 26 Feb 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Uday Master |
| Land area | 8.3 acres (3.3 ha) |
| Project cost | ₹63.1 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17321 |
In context
39 applications in Mumbai since January 2022 are in the same category (Other): 23 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.3 acres, this one is larger than 81% of them.
52 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ Clearance for Proposed Sludge Treatment and its Conversation into an… — lapsed, 100 m away
- CRZ Clearance for proposed under Slum Rehabilitation Scheme of "Cuffe Parade… — lapsed, 500 m away
- CRZ Clearance for Construction of Protective Boundary Wall at World Trade… — recommended by coastal authority, 750 m away
- Proposed Redevelopment on Plot Bearing C.S. No. 88 of Colaba Division situated… — recommended by coastal authority, 850 m away
- Proposed Protection Works for Fishermen Houses near Shivshastri Nagar at Cuffe… — recommended by coastal authority, 1.1 km away
- Proposed Internal Additions/Alterations, Interior Work and Change of User From… — recommended by coastal authority, 1.3 km away
- Strengthening of existing anti-sea erosion bund along the High Tide Line (HTL)… — recommended by coastal authority, 1.3 km away
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.