Quick answers
What is this project?
CRZ Clearance for Proposed development of Beach Resort on S. No. 4/1/7 at Mandve Tarfe Zirad, Tal. Alibaug, Dist. Alibaug by Mrs. Arundhati Dilip Bhonsle and Mrs. Neha Dilip Bhosle is an approved tourism project in Mandava Tarf Zirad, Alibag, Raigarh, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Arundhati Bhonsale.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 8 Jan 2024), as of 27 Nov 2026.
Where is it?
In Mandava Tarf Zirad, Alibag, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹5 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 18 Oct 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 8 Jan 2024 |
| Application filed | 18 Oct 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Arundhati Bhonsale |
| Land area | 400 m² |
| Project cost | ₹5 crore |
| Village / locality | Mandava Tarf Zirad |
| Taluk / tehsil | Alibag |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17572 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Oct 2023 (this page) | Coastal clearance granted | 0.1 acres | ₹5 crore |
| New project filed 21 Jul 2023 | Lapsed | 0.1 acres | ₹5 crore |
In context
9 applications in Raigarh since January 2022 are in the same category (Tourism & hotels): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandava Tarf Zirad, Alibag, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ Clearance for Proposed development of Beach Resort on S. No. 4/1/7 at… — lapsed, 0 m away
- Proposed Holiday Home cum Resort at Survey No. 240 & 250, Village– Dhokawade,… — recommended by coastal authority, 800 m away
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted, 1.2 km away
- Integrated Township project at village - Dhokawade, Tehsil: Alibag, District:… — environmental approval granted, 1.2 km away
- Proposed Integrated Township project at Village: Dhokawade, Tal.: Alibag,… — application filed, 1.2 km away
- Proposed Integrated Township project at Village: Dhokawade, Alibag,… — under environmental review, 1.2 km away
- Environment Clearance of Proposed Construction of Integrated Township Project — cleared for impact study, 1.3 km away
- Environment Clearance of Proposed Construction of Integrated Township Project — lapsed, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.