Quick answers
What is this project?
Providing and Installation of Floating Jetty for Police Launch Section at Girgaon Chaupaty, Mumbai District Maharashtra is a proposed port and coastal project in Ranjankhar Davali, Alibag, Raigarh, Maharashtra. The site covers 0.2 acres.
Who is building it?
The applicant is Maharashtra Maritime Board.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Ranjankhar Davali, Alibag, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 24 Mar 2026.
Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 24 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Maharashtra Maritime Board |
| Land area | 700 m² |
| Project cost | ₹3.5 crore |
| Village / locality | Ranjankhar Davali |
| Taluk / tehsil | Alibag |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-17607 |
In context
54 applications in Raigarh since January 2022 are in the same category (Ports & coast): 25 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.2 acres, this one is smaller than 91% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranjankhar Davali, Alibag, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ clearance for Proposed Temporary platform for event at "Ruia House" on… — recommended by coastal authority, 1 km away
- Extension & Increase in Height of existing jetty at Colaba, Ward-A, Mumbai,… — recommended by coastal authority, 3.8 km away
- Proposed Slum Rehabilitation Scheme under regulation 33(10) of Shastri Nagar… — environmental approval granted, 11.7 km away
- Proposed Slum Rehabilitation Scheme under regulation 33(10) of Shastri Nagar… — cleared for impact study, 11.7 km away
- "Repair, Upgradation and Eco-Friendly Tourism Amenities at Elephanta Island… — more information requested, 12.4 km away
- Jetties in National Waterways-53 proposed to be developed for Kalyan- Thane-… — lapsed, 12.7 km away
- Uran Land,s End Resort Project at kegoan Survey No 190/1 190/2 — lapsed, 13.1 km away
- Entrance Gate Building at Landing Jetty and Development of Adjacent Area in… — coastal clearance granted, 13.6 km away
More from Maharashtra Maritime Board in Raigarh
- Application for Terms of Reference (ToR) for Development of Marine Shipyard… — under environmental review
- Proposed Maintenance Dredging to Clear/Generate Navigational Channel — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — returned to applicant
15 Maharashtra Maritime Board projects in Raigarh
All 101 Maharashtra Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.