Quick answers
What is this project?
Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot Creek, Ratnagiri District, Maharashtra is an approved port and coastal project in Gothe Kh., Mahad, Raigarh, Maharashtra. The site covers 327.8 acres.
Who is building it?
The applicant is Maharashtra Maritime Board.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 23 May 2026), as of 27 Nov 2026.
Where is it?
In Gothe Kh., Mahad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹2 crore and a site of 327.8 acres.
When was it filed?
The application was filed on 27 Feb 2026.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 23 May 2026 |
| Application filed | 27 Feb 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Maharashtra Maritime Board |
| Land area | 327.8 acres (132.7 ha) |
| Project cost | ₹2 crore |
| Village / locality | Gothe Kh. |
| Taluk / tehsil | Mahad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17722 |
In context
54 applications in Raigarh since January 2022 are in the same category (Ports & coast): 25 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 327.8 acres, this one is larger than 85% of them.
Where it is
Gothe Kh., Mahad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — returned to applicant, 0 m away
- Proposed Project of extending the disposal pipe line in Savitri River/Bankot… — application filed, 8.5 km away
- Jetty, Parking Shed and Other Allied Works at Toradi, Taluka- Mhasla,… — coastal clearance granted, 9.6 km away
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks, 12.8 km away
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks, 12.8 km away
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — under coastal review, 12.8 km away
- Extension of Jetty and Providing Parking Facilities at Gothe, Taluka- Mahad,… — withdrawn, 12.9 km away
- Diversion of forest land for laying of underground OFC duct & cable within RoW… — lapsed, 14.8 km away
More from Maharashtra Maritime Board in Raigarh
- Application for Terms of Reference (ToR) for Development of Marine Shipyard… — under environmental review
- Providing and Installation of Floating Jetty for Police Launch Section at… — recommended by coastal authority
- Proposed Maintenance Dredging to Clear/Generate Navigational Channel — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — returned to applicant
15 Maharashtra Maritime Board projects in Raigarh
All 101 Maharashtra Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.