Quick answers
What is this project?
Manufacturing Facility (Greenfield Project) at Plot Nos. E-4, E-5, E-8, E-9 & E-10, Additional Butibori Industrial Area, Nagpur, by M/s. Mahindra & Mahindra Limited is a proposed industrial building project in Dudha, Nagpur (Rural), Nagpur, Maharashtra. The site covers 9.3 acres.
Who is building it?
The applicant is Mahindra and Mahindra LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dudha, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹9,500 crore and a site of 9.3 acres.
When was it filed?
The application was filed on 6 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Mahindra and Mahindra LTD |
| Use | Industrial |
| Land area | 9.3 acres (3.8 ha) |
| Built-up area | 32,12,200 m² (3,45,75,800 sq ft) |
| Plot area | 32,12,200 m² (3,45,75,800 sq ft) |
| Project cost | ₹9,500 crore |
| Village / locality | Dudha |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-18101 |
In context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.3 acres, this one is larger than 55% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dudha, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 27.33 Ha Forest Land (Zudpi Jungle) for Additional Butiburi… — under forest review, 750 m away
- Additionl Butibori Industrial Area ( Village Mangali Area 6.25 Hect) — lapsed, 750 m away
- Diversion of 21.08 Ha. of forest department (Zudpi Jungle) land for Additional… — lapsed, 1.1 km away
- Maharashtra Industrial Development Corporation — lapsed, 1.8 km away
- Addl. Butibori Industrial Area (Village -Dhawalpeth Survey No 70) — under forest review, 2.3 km away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 2.5 km away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 2.5 km away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — initial checks, 2.5 km away
More from Mahindra and Mahindra LTD in Nagpur
- Obtaining Environmental Clearance for the Proposed Industrial Shed for the… — environmental approval granted
All 14 Mahindra and Mahindra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.