Quick answers
What is this project?
Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line plant by M/s. Avaada Electro Pvt. Ltd., at Plot No. A-67, MIDC Road, Additional Butibori Industrial area, Nagpur, Nagpur, Maharashtra, 441108 is a proposed road project in Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The site covers 179.8 acres.
Who is building it?
The applicant is Avaada Electro Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹4,139.8 crore and a site of 179.8 acres.
When was it filed?
The application was filed on 20 Sept 2025.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line plant by…
Project details
| Status | Initial checks |
|---|---|
| Status since | 20 Sept 2025 |
| Application filed | 20 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Avaada Electro Private Limited |
| Land area | 179.8 acres (72.8 ha) |
| Project cost | ₹4,139.8 crore |
| Village / locality | Dhawalpeth |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06911 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 2 Jan 2026 | Environmental approval granted | 130.2 acres | ₹4,139.8 crore |
| Ownership transfer filed 15 Oct 2025 | Environmental approval granted | 179.8 acres | ₹4,139.8 crore |
| New project filed 20 Sept 2025 (this page) | Initial checks | 179.8 acres | ₹4,139.8 crore |
| Expansion filed 7 Jul 2025 | Environmental approval granted | 179.8 acres | ₹4,139.8 crore |
| Early planning filed 27 May 2025 | Cleared for impact study | 179.8 acres | ₹4,139.8 crore |
In context
31 applications in Nagpur since January 2022 are in the same category (Roads & highways): 1 approved, 23 filed or under review, and 7 withdrawn, lapsed or rejected. At 179.8 acres, this one is larger than 61% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhawalpeth, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 0 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 0 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — cleared for impact study, 0 m away
- Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt.… — environmental approval granted, 0 m away
- Expansion in Proposed installation of Integrated 6 GW cell and 5GW module line… — environmental approval granted, 150 m away
- 1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No.… — environmental approval granted, 300 m away
- 1200 MTPD Solar Glass plant by M/s. Avaada Glass Pvt. Ltd., at Plot No.… — cleared for impact study, 300 m away
- Addl. Butibori I.A. Village Tarsi Survey No 148 — lapsed, 500 m away
More from Avaada Electro Private Limited in Nagpur
- Integrated 6 GW cell and 4GW module line plant by M/s. Avaada Electro Pvt.… — environmental approval granted
6 Avaada Electro projects in Nagpur
All 9 Avaada Electro projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.