Quick answers
What is Limestone Mine?
Limestone Mine is an approved mining project in Shnongrim, Saipung, East Jaintia Hills, Meghalaya. The site covers 4.8 acres.
Who is building it?
The applicant is Efficiency Pyrngap.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Apr 2024), as of 27 Nov 2026.
Where is it?
In Shnongrim, Saipung, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹23 lakh and a site of 4.8 acres.
When was it filed?
The application was filed on 1 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Apr 2024 |
| Application filed | 1 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Efficiency Pyrngap |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹23 lakh |
| Village / locality | Shnongrim |
| Taluk / tehsil | Saipung |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00027 |
In context
65 applications in East Jaintia Hills since January 2022 are in the same category (Mining): 49 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.8 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Shnongrim, Saipung, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production… — under environmental review, 1.6 km away
- Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production… — under environmental review, 1.6 km away
- Lum Sakhne Limestone Mine — more information requested, 4.6 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — environmental approval granted, 4.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — environmental approval granted, 4.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — withdrawn, 4.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — cleared for impact study, 4.8 km away
- Sutnga Limestone mine (ML area 230 ha) — environmental approval granted, 5 km away