Quick answers
What is this project?
Amendment in Environment Clearance for for Project Lumshnong Limestone Mine of Star Cement Limited for Reduction in Mining Lease Area From 70 Ha to 66.98 Ha and Permission for Limestone Production From 15 Lakh Tpa(Rom) to 25 Lakh Tpa (Rom) Through Road Transportation With Advance Mitigation Measures is an approved mining project in Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 165.5 acres.
Who is building it?
The applicant is Star Cement Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Aug 2024), as of 27 Nov 2026.
Where is it?
In Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹37.5 crore and a site of 165.5 acres.
When was it filed?
The application was filed on 25 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Aug 2024 |
| Application filed | 25 May 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Star Cement Limited |
| Land area | 165.5 acres (67 ha) |
| Project cost | ₹37.5 crore |
| Village / locality | Lum Shnong |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00124 |
In context
65 applications in East Jaintia Hills since January 2022 are in the same category (Mining): 49 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 165.5 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 30 have applied within 5 km.
Where it is
Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lumshnong-2 Limestone Mine (4.546 ha) — under environmental review, 650 m away
- Lumshnong-1 Limestone Mine (3.927 ha) — under environmental review, 650 m away
- Jaintia Stone Mine — environmental approval granted, 650 m away
- Jaintia Stone Mine — cleared for impact study, 650 m away
- M/s Danima Pdang Limestone Mine — lapsed, 800 m away
- Khad-Moosiang Limestone Deposit over an area 4.75 Ha of M/s. Cement… — environmental approval granted, 1.3 km away
- Khad-Moosiang Limestone Deposit over an area 4.75 Ha of M/s. Cement… — cleared for impact study, 1.3 km away
- Shiahtah Limestone Mine — lapsed, 1.3 km away
More from Star Cement Limited in East Jaintia Hills
- "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star… — environmental approval granted
- Tongseng Shale Deposit (4.99 Ha) — environmental approval granted
- Amendment in Environmental Clearance for project, "Installation of New Line-… — lapsed
- "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star… — cleared for impact study
5 Star Cement projects in East Jaintia Hills
All 15 Star Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.