Quick answers
What is this project?
Amendment in Environmental Clearance for project, "Installation of New Line- II (Clinker- 3.3 MTPA, Cement- 2.0 MTPA and WHRB- 15.5 MW) at existing cement plant site of Star Cement Limited, taking total capacity to 4.09 MTPA clinker, 2.99 MTPA Cement with 20.17 MW of Waste Heat Recovery Power Plant" is a lapsed industrial project in Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 234.7 acres.
Who is building it?
The applicant is Star Cement Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹1,921.7 crore and a site of 234.7 acres.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Star Cement Limited |
| Land area | 234.7 acres (95 ha) |
| Project cost | ₹1,921.7 crore |
| Village / locality | Lum Shnong |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00053 |
In context
12 applications in East Jaintia Hills since January 2022 are in the same category (Industry): 6 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 234.7 acres, this one is larger than 75% of them.
53 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lum Shnong, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement in Cement Clinker Capacity from 1.75 MTPA to 2.25 MTPA of Clinker… — initial checks, 750 m away
- 8 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 900 m away
- 100% Coal-based 8 MW Thermal Power Plant project at Lumshnong, East Jaintia… — withdrawn, 900 m away
- 43 MW Thermal Power Plant at Lumshnong, East Jaintia Hills District, Meghalaya — environmental approval granted, 1 km away
- 43 MW imported coal based Thermal Power Plant project at Lumshnong, East… — withdrawn, 1 km away
- Lumshnong Limestone Mine — environmental approval granted, 1.1 km away
- Lumshnong Limestone Mine over an area of 4.2 Ha of M/s Meghalaya Minerals &… — lapsed, 1.3 km away
- Wah Pynkon-2 Limestone Mine (4.518 ha) — under environmental review, 1.4 km away
More from Star Cement Limited in East Jaintia Hills
- "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star… — environmental approval granted
- Tongseng Shale Deposit (4.99 Ha) — environmental approval granted
- Amendment in Environment Clearance for for Project Lumshnong Limestone Mine of… — environmental approval granted
- "Daba Saitthad Limestone Deposit" having mining lease area of 25 Ha by Star… — cleared for impact study
5 Star Cement projects in East Jaintia Hills
All 15 Star Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.