Quick answers
What is this project?
Diversion of 57.71 Ha Deemed Forest Including 3.4577 Ha of JHADC Working Scheme Forest Land for Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45 645 to Km 78 600, Design Length – 32.955 Km) is a proposed road project in Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya. It seeks 142.6 acres of forest land.
Who is building it?
The applicant is National Highways & Infrastructure Development Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹473.5 crore and 142.6 acres (57.7 ha) of forest land.
When was it filed?
The application was filed on 12 Jul 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 12 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways & Infrastructure Development Corporation Limited |
| Forest land | 142.6 acres (57.7 ha) |
| Project cost | ₹473.5 crore |
| Village / locality | Dkhiah West |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00377 |
In context
5 applications in East Jaintia Hills since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 40.7812 Ha of Deemed/Reserve Forest Land for Development,… — under forest review, 0 m away
- Nehlang Lyngdoh Coal Block — environmental approval granted, 26.3 km away
- Nehlang Lyngdoh Coal Block — cleared for impact study, 26.3 km away
- Saryngkham A Coal Mine — environmental approval granted, 33.2 km away
- Saryngkham A Coal Mine — cleared for impact study, 33.2 km away
- Luti Nongkhlieh Boulder Stone — environmental approval granted, 33.3 km away
- Saryngkham Coal Block B — environmental approval granted, 34.1 km away
- Saryngkham Coal Block B — cleared for impact study, 34.1 km away
More from National Highways & Infrastructure Development Corporation Limited in East Jaintia Hills
- Diversion of 325.88 Ha Forest Area (68.60 Ha Reserve forest, 257.28 Ha. Deemed… — under forest review
- Diversion of 40.7812 Ha of Deemed/Reserve Forest Land for Development,… — under forest review
- Development, Maintenance, Management and Operation of Greenfield High-Speed… — under wildlife review
- Greenfield High-Speed Corridor of 166.80 KM (NH 6) from Mawlyngkhung (near… — under wildlife review
5 National Highways and Infrastructure Development Corporation (NHIDCL) projects in East Jaintia Hills
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.