Diversion of 57.71 Ha Deemed Forest Including 3.4577 Ha of JHADC Working Scheme Forest Land for Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45 645 to Km 78 600, Design Length – 32.955 Km)

Diversion of 57.71 Ha Deemed Forest Including 3.4577 Ha of JHADC Working Scheme Forest Land for Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45 645 to Km 78 600, Design Length – 32.955 Km) is a proposed road project in Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya. It seeks 142.6 acres of forest land. Its stated project cost is ₹473.5 crore. As of 27 Nov 2026, its status is “Under forest review” (since 10 Nov 2026).

See it on the live map All projects in East Jaintia Hills

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 57.71 Ha Deemed Forest Including 3.4577 Ha of JHADC Working Scheme Forest Land for Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45 645 to Km 78 600, Design Length – 32.955 Km) is a proposed road project in Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya. It seeks 142.6 acres of forest land.

Who is building it?

The applicant is National Highways & Infrastructure Development Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya.

How big is it?

It has a stated cost of ₹473.5 crore and 142.6 acres (57.7 ha) of forest land.

When was it filed?

The application was filed on 12 Jul 2026.

Project details

StatusUnder forest review
Status since10 Nov 2026
Application filed12 Jul 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highways & Infrastructure Development Corporation Limited
Forest land142.6 acres (57.7 ha)
Project cost₹473.5 crore
Village / localityDkhiah West
Taluk / tehsilKhliehriat
DistrictEast Jaintia Hills
StateMeghalaya
Location fromSite boundary on record
Our referenceWID-ML-00377

In context

5 applications in East Jaintia Hills since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dkhiah West, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highways & Infrastructure Development Corporation Limited in East Jaintia Hills

5 National Highways and Infrastructure Development Corporation (NHIDCL) projects in East Jaintia Hills
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.