Quick answers
What is this project?
Greenfield High-Speed Corridor of 166.80 KM (NH 6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam- Project Package IV (Meghalaya Portion) Under NHIDCL PMU-Khliehriat is a proposed project in Dona Umbluh, Khliehriat, East Jaintia Hills, Meghalaya. The site covers 44.1 acres.
Who is building it?
The applicant is National Highways & Infrastructure Development Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Dona Umbluh, Khliehriat, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹107.4 crore and a site of 44.1 acres.
When was it filed?
The application was filed on 2 Mar 2026.
Project details
| Official title | Development of Greenfield High-Speed Corridor of 166.80 KM (NH 6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam- Project Package IV (Meghalaya Portion) Under NHIDCL PMU-Khliehriat |
|---|---|
| Status | Under wildlife review |
| Status since | 2 Mar 2026 |
| Application filed | 2 Mar 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | National Highways & Infrastructure Development Corporation Limited |
| Land area | 44.1 acres (17.9 ha) |
| Project cost | ₹107.4 crore |
| Village / locality | Dona Umbluh |
| Taluk / tehsil | Khliehriat |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00404 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dona Umbluh, Khliehriat, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower… — lapsed, 1.2 km away
- Development, Maintenance, Management and Operation of Greenfield High-Speed… — under wildlife review, 9 km away
- Tongseng Shale Deposit (4.99 Ha) — environmental approval granted, 13.5 km away
- Proposed Lum Padiar Shale Mine (Area 21.16 Ha) with Shale Production Capacity:… — cleared for impact study, 13.9 km away
- GVIL Shale Mine — environmental approval granted, 13.9 km away
- GVIL Shale Mine — environmental approval granted, 13.9 km away
- Wah Pynkon Limestone Mine (4.739 ha) — under environmental review, 14.5 km away
- Wah Pynkon-2 Limestone Mine (4.518 ha) — under environmental review, 14.7 km away
More from National Highways & Infrastructure Development Corporation Limited in East Jaintia Hills
- Diversion of 325.88 Ha Forest Area (68.60 Ha Reserve forest, 257.28 Ha. Deemed… — under forest review
- Diversion of 40.7812 Ha of Deemed/Reserve Forest Land for Development,… — under forest review
- Diversion of 57.71 Ha Deemed Forest Including 3.4577 Ha of JHADC Working… — under forest review
- Development, Maintenance, Management and Operation of Greenfield High-Speed… — under wildlife review
5 National Highways and Infrastructure Development Corporation (NHIDCL) projects in East Jaintia Hills
All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.