Quick answers
What is USOF 4G Saturation Project for Manipur?
USOF 4G Saturation Project for Manipur is a lapsed project in Tuipi Mate, Tengnoupal, Manipur. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Tuipi Mate, Tengnoupal, Manipur.
How big is it?
It has a stated cost of ₹88 lakh; a site of 0 acres and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 15 Apr 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: USOF 4G Saturation Project for Manipur
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 15 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Tuipi Mate |
| Taluk / tehsil | Tengnoupal |
| District | Tengnoupal |
| State | Manipur |
| Location from | Site boundary on record |
| Our reference | WID-MN-00075 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Apr 2024 | More information requested | 0 acres | ₹88 lakh |
| New project filed 15 Apr 2023 (this page) | Lapsed | 0 acres | ₹88 lakh |
In context
14 applications in Tengnoupal since January 2022 are in the same category (Other): 1 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tuipi Mate, Tengnoupal, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- USOF 4G Saturation Project for Manipur — more information requested, 0 m away
- Diversion of 4.856 Ha of Forest Land for Company Operating Base at… — more information requested, 4 km away
- Mutation of 160 Acres/64.749 Ha of Forest land in respect of Assam Rifles… — more information requested, 7.2 km away
- Mutation of 160 Acres/64.749 Ha of Forest Land in respect of Assam Rifles… — more information requested, 7.2 km away
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — application filed, 8.5 km away
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — lapsed, 8.5 km away
- Widening and Improvement of Shangshak to Tengnoupal Road (Phase - 8) on NH-39… — more information requested, 13.2 km away
- Border Fencing Between Boundary Pillar (Bp) 81 to Boundary Pillar (Bp) 85 of… — under wildlife review, 13.5 km away
More from Mahesh Nair in Tengnoupal
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — application filed
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — more information requested
- USOF 4G Saturation Project for Manipur — forest land use approved
- USOF 4G Saturation Project for Manipur — more information requested
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — lapsed
- USOF 4G Saturation Project for Manipur — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.