Quick answers
What is USOF 4G Saturation Project for Manipur?
USOF 4G Saturation Project for Manipur is a lapsed project in Saibol, Tengnoupal, Manipur. The site covers 0.5 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Saibol, Tengnoupal, Manipur.
How big is it?
It has a stated cost of ₹8.8 crore; a site of 0.5 acres and 1,670 m² of forest land.
When was it filed?
The application was filed on 17 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 17 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 1,900 m² |
| Forest land | 1,670 m² |
| Project cost | ₹8.8 crore |
| Village / locality | Saibol |
| Taluk / tehsil | Tengnoupal |
| District | Tengnoupal |
| State | Manipur |
| Location from | Site boundary on record |
| Our reference | WID-MN-00114 |
In context
14 applications in Tengnoupal since January 2022 are in the same category (Other): 1 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.5 acres, this one is larger than 50% of them.
Where it is
Saibol, Tengnoupal, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Construction of Mobile Tower — under forest review, 29.7 km away
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — more information requested, 34 km away
- USOF 4G Saturation Project for Manipur — more information requested, 38.8 km away
- USOF 4G Saturation Project for Manipur — lapsed, 38.8 km away
- USOF 4G Saturation Project for Manipur — forest land use approved, 39.3 km away
- USOF 4G Saturation Project for Manipur — more information requested, 39.3 km away
- Widening and Improvement of Shangshak to Tengnoupal Road (Phase - 8) on NH-39… — more information requested, 39.5 km away
- Diversion of 4.856 Ha of Forest Land for Company Operating Base at… — more information requested, 41 km away
More from Mahesh Nair in Tengnoupal
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — application filed
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — more information requested
- USOF 4G Saturation Project for Manipur — more information requested
- USOF 4G Saturation Project for Manipur — forest land use approved
- USOF 4G Saturation Project for Manipur — more information requested
- DNB Funded 4G Saturation Project in Manipur (CAT 6 sites) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.