One of 3 filings for this project. The project's main page, with every filing and where each stands: Construction of Water Treatment Plant at Naodangkhong
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 30 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Phed |
| Land area | 2,400 m² |
| Forest land | 2,430 m² |
| Project cost | ₹1.7 crore |
| Village / locality | Wangoo Keirap |
| Taluk / tehsil | Moirang |
| District | Bishnupur |
| State | Manipur |
| Location from | Site boundary on record |
| Our reference | WID-MN-00122 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2024 | More information requested | 0.6 acres | ₹1.7 crore |
| New project filed 3 Oct 2023 | Under forest review | 0.6 acres | ₹1.7 crore |
| New project filed 30 Jan 2023 (this page) | Lapsed | 0.6 acres | ₹1.7 crore |
In context
12 applications in Bishnupur since January 2022 are in the same category (Water & irrigation): 3 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.6 acres, this one is smaller than 67% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wangoo Keirap, Moirang, Bishnupur, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Water Treatment Plant at Naodangkhong — more information requested, 0 m away
- Construction of Water Treatment Plant at Naodangkhong — under forest review, 0 m away
- Construction of Water Treatment Plant at Tampha Khunou — more information requested, 2.2 km away
- Construction of Water Treatment Plant at Tampha Khunou — under forest review, 2.2 km away
- Augmentation of Water Treatment Plant at Wathalambi — more information requested, 3.2 km away
- Augmentation of Water Treatment Plant at Wathalambi — under forest review, 3.2 km away
- Augmentation of Water Treatment Plant at Pombikhok — under forest review, 8.2 km away
- Augmentation of Water Treatment Plant at Keibul Lamjao — under forest review, 9.8 km away
More from Phed in Bishnupur
- Augmentation of Water Treatment Plant at Thanga — more information requested
- Augmentation of Water Treatment Plant at Keibul Lamjao — under forest review
- Augmentation of Water Treatment Plant at Wathalambi — more information requested
- Construction of Water Treatment Plant at Tampha Khunou — more information requested
- Augmentation of Water Treatment Plant at Keibul Lamjao — decision issued
- Augmentation of Water Treatment Plant at Keibul Lamjao (0.40 MLD) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.