One of 2 filings for this project. The project's main page, with every filing and where each stands: Bhadanpur Limestone Mine (ML Area: 217.681 ha) with expansion in Limestone production…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 May 2023 |
| Application filed | 1 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 537.9 acres (217.7 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Bhadanpur |
| Taluk / tehsil | Maihar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00021 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Nov 2023 | Environmental approval granted | 537.9 acres | ₹2.9 crore |
| Early planning filed 1 May 2023 (this page) | Cleared for impact study | 537.9 acres | ₹2.9 crore |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 537.9 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Bhadanpur, Maihar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhadanpur Limestone Mine (ML Area: 217.681 ha) with expansion in Limestone… — environmental approval granted, 0 m away
- Bhadanpur South Patti Limestone mine (23.230ha) — lapsed, 2.5 km away
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn, 3.2 km away
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review, 3.2 km away
- 33 KV Line Maihar to Badera ID 843204 — more information requested, 3.3 km away
- Bhadanpur Dakshin Patti Limestone Mine — environmental approval granted, 4.2 km away
- Bhadanpur Dakshin Patti Limestone Mine — cleared for impact study, 4.2 km away
- Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production… — cleared for impact study, 4.4 km away
More from UltraTech Cement Limited in Satna
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn
- Atarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production… — under environmental review
- Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production… — cleared for impact study
- Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II… — environmental approval granted
- Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0… — environmental approval granted
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review
14 UltraTech Cement projects in Satna
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.