Project details
| Official title | Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production Capacity: 2.30 Million TPA, Top Soil: 0.05 Million TPA & Overburden: 0.89 Million TPA (Total Excavation: 3.24 Million TPA) located at Village: Riwara, Tehsil: Maihar, District: Maihar, Madhya Pradesh. |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Sept 2026 |
| Application filed | 30 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 746.9 acres (302.3 ha) |
| Project cost | ₹61.8 crore |
| Village / locality | Riwara |
| Taluk / tehsil | Maihar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09086 |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 746.9 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Riwara, Maihar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Latagaon Limestone & Reject Stone Mine (8.094 ha.) — environmental approval granted, 1.1 km away
- Bhadanpur Limestone Mine (ML Area: 217.681 ha) with expansion in Limestone… — environmental approval granted, 4.4 km away
- Bhadanpur Limestone Mine (ML Area: 217.681 ha) with expansion in Limestone… — cleared for impact study, 4.4 km away
- Bhadanpur South Patti Limestone mine (23.230ha) — lapsed, 5.7 km away
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn, 5.9 km away
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review, 5.9 km away
- Bhadanpur Dakshin Patti Limestone Mine — environmental approval granted, 6.9 km away
- Bhadanpur Dakshin Patti Limestone Mine — cleared for impact study, 6.9 km away
More from UltraTech Cement Limited in Satna
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn
- Atarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production… — under environmental review
- Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II… — environmental approval granted
- Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0… — environmental approval granted
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review
- Expansion in Limestone Production Capacity from 1.2 million TPA to 3.0 million… — lapsed
14 UltraTech Cement projects in Satna
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.