Quick answers
What is Misiragawan Stone Quarry?
Misiragawan Stone Quarry is a proposed mining project in Misigawan, Chitrangi, Singrauli, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Surendra Jain.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Misigawan, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 13 Sept 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Sept 2023 |
| Application filed | 13 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Surendra Jain |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Misigawan |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01138 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 84% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3,826.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Misigawan, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Prospecting Work in Misirgawan Iron Ore Mine — forest land use approved, 350 m away
- Khamariya Khurd Metal Stone Quarry — lapsed, 1.3 km away
- Mahugadi Pawai Stone Quarry — cleared for impact study, 1.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 4.1 km away
- Mauhariya Stone Quarry — not approved, 5.9 km away
- Mauhariya Stone Quarry — environmental approval granted, 5.9 km away
- Mauhariya Stone Quarry — cleared for impact study, 5.9 km away
- Mauhariya Stone Quarry — lapsed, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.