Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Last Mile Kushaniya DFO Waidan Singrauli is an approved telecom project in Kushahaniyan, Chitrangi, Singrauli, Madhya Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 Dec 2024), as of 27 Nov 2026.
Where is it?
In Kushahaniyan, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹15 lakh; a site of 1.6 acres and 1,850 m² of forest land.
When was it filed?
The application was filed on 5 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 Dec 2024 |
| Application filed | 5 Sept 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1,850 m² |
| Project cost | ₹15 lakh |
| Village / locality | Kushahaniyan |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10721 |
In context
10 applications in Singrauli since January 2022 are in the same category (Telecom): 7 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 1.6 acres, this one is smaller than 60% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kushahaniyan, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Misiragawan Stone Quarry — more information requested, 4.1 km away
- Prospecting Work in Misirgawan Iron Ore Mine — forest land use approved, 4.4 km away
- Khamariya Khurd Metal Stone Quarry — lapsed, 4.6 km away
- Mahugadi Pawai Stone Quarry — cleared for impact study, 4.6 km away
- L-171 PMGSY Road to Butawa Baiga Basti PMJANMAN Road — lapsed, 5.9 km away
- Mauhariya Stone Quarry — not approved, 6.4 km away
- Mauhariya Stone Quarry — environmental approval granted, 6.4 km away
- Mauhariya Stone Quarry — cleared for impact study, 6.4 km away
More from Jio Digital Fibre Private LTD in Singrauli
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
6 Jio Digital Fibre projects in Singrauli
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.