Quick answers
What is Girdouda Stone For M-Sand Quarry?
Girdouda Stone For M-Sand Quarry is an approved mining project in Girdoda, Neemuch, Madhya Pradesh. The site covers 4.2 acres.
Who is building it?
The applicant is Lalita Patidar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Apr 2024), as of 27 Nov 2026.
Where is it?
In Girdoda, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 17 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Apr 2024 |
| Application filed | 17 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Lalita Patidar |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Girdoda |
| Taluk / tehsil | Neemuch |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01209 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jan 2024 (this page) | Environmental approval granted | 4.2 acres | ₹60 lakh |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 4.2 acres | ₹60 lakh |
In context
122 applications in Neemuch since January 2022 are in the same category (Mining): 63 approved, 23 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.2 acres, this one is smaller than 88% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Girdoda, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Girdouda Stone For M-Sand Quarry — cleared for impact study, 0 m away
- Application for No Increase in Pollution Load for proposed expansion of M/s… — initial checks, 1.9 km away
- No Increase in Pollution load for proposed expansion of M/s Dhanuka Soya… — initial checks, 1.9 km away
- Proposed 320 KLD Grain Based Ethanol Plant by M/s. Dhanuka Soya Private Limited — environmental approval granted, 1.9 km away
- Chothkheda Stone Quarry — lapsed, 5.4 km away
- Industrial project by M/s. Mangal Synthesis Private Limited — environmental approval granted, 7.1 km away
- Arnyamangir Stone Quarry Project — environmental approval granted, 7.3 km away
- Pipliya Baag Murrum Quarry for S.T.P — environmental approval granted, 8.4 km away
More from Lalita Patidar in Neemuch
- Suwakheda Stone (Gitti) Quarry — environmental approval granted
- Bamanbardi Stone(Gitt) Quarry-New — lapsed
- Suwakheda Stone (Gitti) Quarry — environmental approval granted
- Bamanbardi Stone(Gitt) Quarry — under environmental review
- Suwakheda Stone (Gitti) Quarry — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.