What is Developing? Open the mapMap

Environmental approval grantedIndustry · Dhar, Madhya Pradesh

Regularization of Existing Production Facilities for Steel Wires of Capacity 180000 TPA [Seeking EC for regularization of existing CTE Capacity as per NGT Order dtd. 12.02.2020 and MoEFCC, Notification S.O. 3250(E) dtd. 20.07.2022] At Plot No. 158 & 158A, Sector-III, Industrial Area Pithampur, Tehsil & District : Dhar, Madhya Pradesh – 454775 by M/s. Tata Steel Limited

Regularization of Existing Production Facilities for Steel Wires of Capacity 180000 TPA [Seeking EC for regularization of existing CTE Capacity as per NGT Order dtd. 12.02.2020 and MoEFCC, Notification S.O. 3250(E) dtd. 20.07.2022] At Plot No. 158 & 158A, Sector-III, Industrial Area Pithampur, Tehsil & District : Dhar, Madhya Pradesh – 454775 by M/s. Tata Steel Limited is an approved industrial project in Pithyapura, Dhar, Madhya Pradesh. The site covers 20 acres. Its stated project cost is ₹132 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Aug 2023).

See it on the live map All projects in Dhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since30 Aug 2023
Application filed30 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantM/S. Tata Steel Limited
Land area20 acres (8.1 ha)
Project cost₹132 crore
Village / localityPithyapura
Taluk / tehsilDhar
DistrictDhar
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-01374

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Aug 2023 (this page)Environmental approval granted20 acres₹132 crore
Early planning filed 27 Apr 2023Cleared for impact study20 acres₹132 crore

In context

53 applications in Dhar since January 2022 are in the same category (Industry): 30 approved, 14 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20 acres, this one is larger than 58% of them.

48 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pithyapura, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 104 Tata Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.