Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Feb 2025 |
| Application filed | 16 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shyam Sel & Power Limited |
| Land area | 18 acres (7.3 ha) |
| Project cost | ₹145 crore |
| Village / locality | Bagdan |
| Taluk / tehsil | Dhar |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06495 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2025 | Environmental approval granted | 18 acres | ₹145 crore |
| Early planning filed 16 Feb 2025 (this page) | Cleared for impact study | 18 acres | ₹145 crore |
In context
53 applications in Dhar since January 2022 are in the same category (Industry): 30 approved, 14 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 18 acres, this one is larger than 55% of them.
40 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bagdan, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Steel Plant and Bright Bar — environmental approval granted, 0 m away
- Regularization of Existing Production Facilities for Steel Wires of Capacity… — environmental approval granted, 500 m away
- Regularization of Existing Production Facilities for Steel Wires of Capacity… — cleared for impact study, 500 m away
- Industrial project by Shyam Sel & Power Limited — under environmental review, 500 m away
- Industrial project by Shyam Sel & Power Limited — under environmental review, 500 m away
- Proposed Project of Rolling Mill With Wire Drawing Mill, Pickling Plant and… — lapsed, 500 m away
- Proposed Project of Rolling Mill With Wire Drawing Mill, Pickling Plant and… — under environmental review, 500 m away
- Mittal Corp Limited - "Proposed Expansion of the Existing Rolling Mill… — not approved, 500 m away
More from Shyam Sel & Power Limited in Dhar
- Industrial project by Shyam Sel & Power Limited — under environmental review
- Industrial project by Shyam Sel & Power Limited — under environmental review
- Proposed Project of Rolling Mill With Wire Drawing Mill, Pickling Plant and… — lapsed
- Proposed Project of Rolling Mill With Wire Drawing Mill, Pickling Plant and… — under environmental review
6 Shyam Sel & Power projects in Dhar
All 16 Shyam Sel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.