Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Aug 2023 |
| Application filed | 22 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Chandel |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Sunari Mohagaon |
| Taluk / tehsil | Chhindwara |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01549 |
In context
144 applications in Chhindwara since January 2022 are in the same category (Mining): 77 approved, 18 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 94% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Sunari Mohagaon, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kodarkhapa Sand Quarry; Quarry lease area 1.00 Ha, Production 1260 m3/year, at… — environmental approval granted, 400 m away
- Shahpura Crusher Stone Quarry of Shri Nitin Thakur — lapsed, 4.9 km away
- Jatama Sand Quarry; Quarry lease area 5.0 Ha, Production 2100 m3/year at… — under environmental review, 6.2 km away
- Construction, Operation and Maintenance of Pench Diversion Canal Project… — in-principle approval, conditions pending, 8.3 km away
- Badiwada Sand Quarry; Quarry lease area 4.30 Ha, Production 12900 m3/year at… — environmental approval granted, 8.4 km away
- Bhanadehi Crusher Stone Quarry of Shri Taranjeet Singh Bedi — environmental approval granted, 9.7 km away
- Bhanadehi Crusher Stone Quarry of Shri Taranjeet Singh Bedi — cleared for impact study, 9.7 km away
- Kauakheda Sand Quarry; Quarry lease area 2.0 Ha, Production 3840 m3/year at… — environmental approval granted, 9.9 km away
More from Jitendra Chandel in Chhindwara
- Pipla Kanhan Sand Quarry — lapsed
- Sayra Sand Quarry — environmental approval granted
- Palaspani Sand Quarry — environmental approval granted
- Malegaon Sand Quarry — environmental approval granted
- Lohani Sand Quarry — environmental approval granted
- Baradevi Khapa Sand Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.