Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Aug 2023 |
| Application filed | 29 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Deft Chemicals Private Limited |
| Land area | 15.3 acres (6.2 ha) |
| Project cost | ₹66.3 crore |
| Village / locality | Malanpur (Ct) |
| Taluk / tehsil | Gohad |
| District | Bhind |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01577 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2023 (this page) | Environmental approval granted | 15.3 acres | ₹66.3 crore |
| Early planning filed 24 May 2023 | Cleared for impact study | 15.3 acres | ₹66.3 crore |
In context
15 applications in Bhind since January 2022 are in the same category (Industry): 10 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 15.3 acres, this one is larger than 73% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malanpur (Ct), Gohad, Bhind, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bulk Drugs, API Production and its intermediates — cleared for impact study, 0 m away
- Proposed Expansion in Existing Manufacturing Plant of polyester chips… — environmental approval granted, 300 m away
- Proposed Expansion in Existing Manufacturing Plant of polyester chips… — cleared for impact study, 300 m away
- Industrial project by M/s. Octet Pharmachem Pvt. Ltd. — under environmental review, 400 m away
- Industrial project by M/s. Octet Pharmachem Pvt. Ltd. — cleared for impact study, 400 m away
- Proposed Bulk Drugs & its Intermediates Production — under environmental review, 1.2 km away
- Proposed Bulk Drugs & its Intermediates Production — cleared for impact study, 1.2 km away
- Manufacturing of Bulk drugs API & Intermediates — initial checks, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.