One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Octet Pharmachem Pvt. Ltd.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Feb 2025 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Octet Pharmachem Private Limited |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹7 crore |
| Village / locality | Ghirongi |
| Taluk / tehsil | Gohad |
| District | Bhind |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07528 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2025 (this page) | Under environmental review | 2.8 acres | ₹7 crore |
| Early planning filed 3 Feb 2024 | Cleared for impact study | 2.8 acres | ₹7 crore |
In context
15 applications in Bhind since January 2022 are in the same category (Industry): 10 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.8 acres, this one is smaller than 73% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghirongi, Gohad, Bhind, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Octet Pharmachem Pvt. Ltd. — cleared for impact study, 0 m away
- Proposed Expansion in Existing Manufacturing Plant of polyester chips… — environmental approval granted, 350 m away
- Proposed Expansion in Existing Manufacturing Plant of polyester chips… — cleared for impact study, 350 m away
- Bulk Drugs, API Production and its intermediates — environmental approval granted, 400 m away
- Bulk Drugs, API Production and its intermediates — cleared for impact study, 400 m away
- Manufacturing of Bulk drugs API & Intermediates — initial checks, 1 km away
- Proposed Bulk Drugs & its Intermediates Production — under environmental review, 1.1 km away
- Proposed Bulk Drugs & its Intermediates Production — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.