One of 2 filings for this project. The project's main page, with every filing and where each stands: Kalaria Soil Quarry
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Jan 2024 |
| Application filed | 15 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Virendra Prajapati |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Kalariya |
| Taluk / tehsil | Indore |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01628 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 17 Apr 2026 | Environmental approval granted | 2.5 acres | ₹18 lakh |
| New project filed 15 Jan 2024 (this page) | Environmental approval granted | 2.5 acres | ₹18 lakh |
In context
129 applications in Indore since January 2022 are in the same category (Mining): 70 approved, 16 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 13 days from filing to approval. At 2.5 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kalariya, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalaria Soil Quarry — environmental approval granted, 0 m away
- Machal Stone & Murram Quarry — lapsed, 3.7 km away
- Proposed Project for Manufacturing of Active Pharmaceutical Ingredients… — under environmental review, 5.5 km away
- Proposed Project for Manufacturing of Active Pharmaceutical Ingredients… — cleared for impact study, 5.5 km away
- Proposed Multi Dwelling Units "Housing for All Under PMAY 2.0 -Tapti Parisar… — under environmental review, 6 km away
- Proposed Multi Dwelling Units "Housing for All Under PMAY 2.0 Tapti Parisar… — withdrawn, 6 km away
- Mohna Murrum Quarry — environmental approval granted, 6.5 km away
- Dhannad Stone Quarry — lapsed, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.