Quick answers
What is Katamal Dolomite Mining Project at Khasra no. 450, 452 & 457?
Katamal Dolomite Mining Project at Khasra no. 450, 452 & 457 is a lapsed mining project in Jibratola, Bichhiya, Mandla, Madhya Pradesh. The site covers 4.5 acres.
Who is building it?
The applicant is Nitin Agrawal.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Jibratola, Bichhiya, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 29 Dec 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nitin Agrawal |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Jibratola |
| Taluk / tehsil | Bichhiya |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02012 |
In context
180 applications in Mandla since January 2022 are in the same category (Mining): 102 approved, 22 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.5 acres, this one is smaller than 74% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 62 mining leases have applied within 5 km.
Where it is
Jibratola, Bichhiya, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Katamal Dolomite Quarry Project of Shri Nitin Kumar Agrawal — environmental approval granted, 0 m away
- MUGDARA-2 SAND QUARRY (1.60Ha) — lapsed, 650 m away
- MUGDARA-2 SAND QUARRY (1.60Ha) — lapsed, 650 m away
- Kata Mal - 2 Sand Quarry — under environmental review, 700 m away
- Kata Mal - 2 Sand Quarry — withdrawn, 700 m away
- "Katamal Dolomite Mining Project" Project Location- At Khasra No. 574, 596,… — environmental approval granted, 750 m away
- "Katamal Dolomite Mining Project" Project Location- At Khasra No. 574, 596,… — cleared for impact study, 750 m away
- Katamal Dolomite Quarry — withdrawn, 850 m away
More from Nitin Agrawal in Mandla
- Katamal Dolomite Quarry Project of Shri Nitin Kumar Agrawal — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.