Quick answers
What is this project?
Lasudiyanathi Murram Quarry (Temporary permit for the Railway line Tender no. RTM-NRD-DyCE-C-21-22-03) is an approved mining project in Lasudiya Nathi, Piploda, Ratlam, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Ananya Engineering Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Apr 2023), as of 27 Nov 2026.
Where is it?
In Lasudiya Nathi, Piploda, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 15 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2023 |
| Application filed | 15 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ananya Engineering Private Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Lasudiya Nathi |
| Taluk / tehsil | Piploda |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02221 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Lasudiya Nathi, Piploda, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bagakheda Stone, M-Sand & Murrum Quarry — environmental approval granted, 6.5 km away
- Jhalwa Stone(Gitti)Quarry — environmental approval granted, 6.9 km away
- Jhalava Murrum Quarry — environmental approval granted, 7 km away
- Banwada Stone (Gitti&M-sand) Quarry — under environmental review, 7.2 km away
- Banwada Stone Quarry — lapsed, 7.2 km away
- Rojana Stone Mine-2.0ha — lapsed, 7.5 km away
- Rojana Stone Quarry — lapsed, 7.5 km away
- Rojana Stone Quarry — environmental approval granted, 7.6 km away
More from Ananya Engineering Private Limited in Ratlam
- Badayala Chourasi Stone Quarry — environmental approval granted
- Badayala Chourasi Murram Quarry (Temporary Permit) — environmental approval granted
3 Ananya Engineering projects in Ratlam
All 6 Ananya Engineering projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.