Quick answers
What is Badayala Chourasi Stone Quarry?
Badayala Chourasi Stone Quarry is an approved mining project in Badayala Chorasi, Piploda, Ratlam, Madhya Pradesh. The site covers 9.6 acres.
Who is building it?
The applicant is Ananya Engineering Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Feb 2023), as of 27 Nov 2026.
Where is it?
In Badayala Chorasi, Piploda, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.6 acres.
When was it filed?
The application was filed on 24 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Feb 2023 |
| Application filed | 24 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ananya Engineering Private Limited |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Badayala Chorasi |
| Taluk / tehsil | Piploda |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02358 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.6 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Badayala Chorasi, Piploda, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Badayala Chorasi Murram Quarry — environmental approval granted, 200 m away
- Badayala Chorasi Stone Quarry — environmental approval granted, 1.5 km away
- Badayala Chorasi Stone Quarry — environmental approval granted, 1.6 km away
- Badayala Chourasi Murram Quarry (Temporary Permit) — environmental approval granted, 1.8 km away
- Sadakhedi Stone Quarry — lapsed, 2 km away
- Namli Stone Quarry — lapsed, 11.7 km away
- Namli Stone Quarry — lapsed, 11.7 km away
- Namli Stone Mine — lapsed, 11.9 km away
More from Ananya Engineering Private Limited in Ratlam
- Lasudiyanathi Murram Quarry (Temporary permit for the Railway line Tender no.… — environmental approval granted
- Badayala Chourasi Murram Quarry (Temporary Permit) — environmental approval granted
3 Ananya Engineering projects in Ratlam
All 6 Ananya Engineering projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.