What is Developing? Open the mapMap

Cleared for impact studyIndustry · Dhar, Madhya Pradesh

Mittal Corp Limited - "Proposed Expansion of the Existing Rolling Mill production from 1, 50,000 to 1, 80,000 TPA with Installation of Wire Drawing Mill, Pickling Plant and Annealing Plant within existing facility over an area of 60,000 sq.mt at Plot No 164C, Sector III, Industrial Area, Pithampur, District Dhar (MP)"

Mittal Corp Limited - "Proposed Expansion of the Existing Rolling Mill production from 1, 50,000 to 1, 80,000 TPA with Installation of Wire Drawing Mill, Pickling Plant and Annealing Plant within existing facility over an area of 60,000 sq.mt at Plot No 164C, Sector III, Industrial Area, Pithampur, District Dhar (MP)" is a proposed industrial project in Bagdan, Dhar, Madhya Pradesh. The site covers 14.8 acres. Its stated project cost is ₹397.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Sept 2023).

See it on the live map All projects in Dhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since14 Sept 2023
Application filed14 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMittal Corp Limited
Land area14.8 acres (6 ha)
Project cost₹397.3 crore
Village / localityBagdan
Taluk / tehsilDhar
DistrictDhar
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-02326

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 19 Apr 2024Not approved14.8 acres₹397.3 crore
Expansion filed 16 Feb 2024Not approved14.8 acres₹397.3 crore
Early planning filed 14 Sept 2023 (this page)Cleared for impact study14.8 acres₹397.3 crore

In context

53 applications in Dhar since January 2022 are in the same category (Industry): 30 approved, 14 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.8 acres, this one is smaller than 60% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bagdan, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Mittal Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.