Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Chief Engineer,rani Avanti Bai Lodhi Sagar Project |
| Land area | 2,06,812.5 acres (83,694.2 ha) |
| Project cost | ₹2,631.7 crore |
| Village / locality | Bansdongri |
| Taluk / tehsil | Tamia |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02499 |
In context
19 applications in Chhindwara since January 2022 are in the same category (Water & irrigation): 11 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 2,06,812.5 acres, this one is larger than 84% of them.
Where it is
Bansdongri, Tamia, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — forest land use approved, 6.3 km away
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — lapsed, 6.3 km away
- L023 Pipardhar To Gondalpani Road — under forest review, 12.7 km away
- Dudhi Project — lapsed, 14.6 km away
- Dudhi Project — under forest review, 14.8 km away
- L-94 Bodalkachar to Samardoh Road PMJANMAN scheme Pk nunder o-MP07PMJM008 — under forest review, 16.5 km away
- L-046 Gudichatri to Sopatiya Road. — lapsed, 17 km away
- L-90 Ankhawadi Chakhla Via Dholni Malni Via Pachgol Road where in total forest… — more information requested, 17.7 km away
More from Chief Engineer,rani Avanti Bai Lodhi Sagar Project in Chhindwara
- Shakkar Pench Link Combined Project Phase I (Hard Dam) — environmental approval granted
- Shakkar Pench Link Combined Project Phase-1 Hard Dam — forest land use approved
- Shakkar Pench Link Combined Project Phase I (Hard Dam) — cleared for impact study
- Shakkar Pench Link Combined Project — cleared for impact study
5 Chief Engineer,rani Avanti projects in Chhindwara
All 11 Chief Engineer,rani Avanti projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.