| Status | Forest land use approved |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 25 Mar 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 5.5 acres (2.2 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Gaildubba Protected Forest |
| Taluk / tehsil | Tamia |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11324 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 25 Mar 2024 (this page) | Forest land use approved | 5.5 acres | ₹3 lakh |
| Change of use filed 11 Jan 2024 | Lapsed | 5.5 acres | ₹3 lakh |
In context
20 applications in Chhindwara since January 2022 are in the same category (Telecom): 7 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 5.5 acres, this one is larger than 75% of them.
Where it is
Gaildubba Protected Forest, Tamia, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — lapsed, 0 m away
- Dudhi Project — cleared for impact study, 6.3 km away
- L023 Pipardhar To Gondalpani Road — under forest review, 17 km away
- New 33 KV Line From 33/11 KV S/S Kuwabadla to new 33/11 KV S/S Sangakheda — forest land use approved, 18 km away
- Environmental Clearance for drilling of 25 nos. of Coalbed Methane (CBM)… — environmental approval granted, 18.8 km away
- Dudhi Project — lapsed, 18.8 km away
- Dudhi Project — under forest review, 19.1 km away
- L-046 Gudichatri to Sopatiya Road. — lapsed, 19.7 km away
More from Mahesh Nair in Chhindwara
- 4g Saturation Project in Chhindwara Operational Area — initial checks
- 4g Saturation Project in Sausar and Pandhurna Block Under Chhindwara… — initial checks
- "Land Acquisition Process for 4G Mobile Towers in Parasia, Tamia, and… — under forest review
- Chhindwara M.P. 4g Saturation Project Land Acquisition — withdrawn
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in East… — lapsed
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.