One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Dhaukan-Dhaurra-Urdaurra Iron Ore Block
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Feb 2025 |
| Application filed | 17 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/s Pacific Iron Manufacturing Ltd. |
| Land area | 378.1 acres (153 ha) |
| Project cost | ₹170 crore |
| Village / locality | Urdaura |
| Taluk / tehsil | Prithvipur |
| District | Niwari |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-03254 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Nov 2025 | Environmental approval granted | 378.1 acres | ₹170 crore |
| Early planning filed 17 Apr 2024 (this page) | Cleared for impact study | 378.1 acres | ₹170 crore |
In context
268 applications in Niwari since January 2022 are in the same category (Mining): 150 approved, 35 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 378.1 acres, this one is larger than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Urdaura, Prithvipur, Niwari, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Dhaukan-Dhaurra-Urdaurra Iron Ore Block — environmental approval granted, 200 m away
- Forest Clearance for Pacific Metasteel Private Limited (PMPL) — lapsed, 2.6 km away
- Transfer of Environmental Clearance (change in name) issued for Steel Plant of… — environmental approval granted, 3 km away
- Pathari Stone (Gitti) Mine — environmental approval granted, 10.1 km away
- Bhopalpura Stone Quarry — environmental approval granted, 10.3 km away
- Jer Murrum Quarry — environmental approval granted, 11.4 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — environmental approval granted, 11.5 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — cleared for impact study, 11.5 km away
All 3 Pacific Iron Manufacturing projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.