Project details
| Official title | Transfer of Environmental Clearance (change in name) issued for Steel Plant of M/s Pacific Metasteel Private Limited, involving production of pellets, DRI, MS billets and TMT rebars along with an iron ore beneficiation plant and CPP of 43 MW, located at Prithvipur, District Niwari, Madhya Pradesh, to M/s Pacific Iron Manufacturing Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Jun 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Pacific Iron Manufacturing Limited |
| Land area | 340.3 acres (137.7 ha) |
| Project cost | ₹1,772.1 crore |
| Village / locality | Sakera Khurd |
| Taluk / tehsil | Prithvipur |
| District | Niwari |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08543 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sakera Khurd, Prithvipur, Niwari, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Clearance for Pacific Metasteel Private Limited (PMPL) — lapsed, 450 m away
- Proposed Dhaukan-Dhaurra-Urdaurra Iron Ore Block — environmental approval granted, 2.8 km away
- Proposed Dhaukan-Dhaurra-Urdaurra Iron Ore Block — cleared for impact study, 3 km away
- Jer Murrum Quarry — environmental approval granted, 8.4 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — environmental approval granted, 8.6 km away
- Greenfield Steel Plant Project to produce Pellets 1.0 Million TPA; DRI 0.4… — cleared for impact study, 8.6 km away
- Bhopalpura Stone Quarry — environmental approval granted, 9.3 km away
- MAJRA BHELSA Gitti Stone Mine — environmental approval granted, 9.6 km away
All 3 Pacific Iron Manufacturing projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.