Quick answers
What is Mohbala Sand Quarry?
Mohbala Sand Quarry is a lapsed mining project in Muhavla, Manpur, Umaria, Madhya Pradesh. The site covers 25 acres.
Who is building it?
The applicant is Gayaprasad Anjne.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Muhavla, Manpur, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4.5 crore and a site of 25 acres.
When was it filed?
The application was filed on 2 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 2 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Gayaprasad Anjne |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹4.5 crore |
| Village / locality | Muhavla |
| Taluk / tehsil | Manpur |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03779 |
In context
145 applications in Umaria since January 2022 are in the same category (Mining): 65 approved, 21 filed or under review, and 59 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 25 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Muhavla, Manpur, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mohbala Sand Quarry — environmental approval granted, 0 m away
- Mohbala Sand Quarry — cleared for impact study, 0 m away
- Parasi Sand Quarry_10.0Ha — cleared for impact study, 4 km away
- Parasi Sand Quarry — withdrawn, 4 km away
- Amiliya Sand Quarry — environmental approval granted, 4.3 km away
- Amiliya Sand Quarry_9.00 ha — cleared for impact study, 4.7 km away
- Amiliya Sand Quarry_9.00 ha — withdrawn, 4.7 km away
- Construction of 33/11kv sub station Balhaud — lapsed, 4.9 km away
More from Gayaprasad Anjne in Umaria
- Amiliya Sand Quarry_11.00 ha — withdrawn
- Amiliya Sand Quarry_9.00 ha — withdrawn
- Parasi Sand Quarry — withdrawn
- Mohbala Sand Quarry — environmental approval granted
- Khairbhar-1 River Sand Quarry — environmental approval granted
- Jhala River Sand Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.