Quick answers
What is Mohbala Sand Quarry?
Mohbala Sand Quarry is a proposed mining project in Mohbala, Manpur, Umaria, Madhya Pradesh. The site covers 25 acres.
Who is building it?
The applicant is Gayaprasad Anjne.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Apr 2024), as of 27 Nov 2026.
Where is it?
In Mohbala, Manpur, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1 lakh and a site of 25 acres.
When was it filed?
The application was filed on 31 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mohbala Sand Quarry
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Apr 2024 |
| Application filed | 31 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gayaprasad Anjne |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹1 lakh |
| Village / locality | Mohbala |
| Taluk / tehsil | Manpur |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04822 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Mar 2025 | Environmental approval granted | 25 acres | ₹1 lakh |
| Early planning filed 31 Jan 2024 (this page) | Cleared for impact study | 25 acres | ₹1 lakh |
In context
145 applications in Umaria since January 2022 are in the same category (Mining): 65 approved, 21 filed or under review, and 59 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 25 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Mohbala, Manpur, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mohbala Sand Quarry — environmental approval granted, 0 m away
- Mohbala Sand Quarry — lapsed, 0 m away
- Parasi Sand Quarry_10.0Ha — cleared for impact study, 4 km away
- Parasi Sand Quarry — withdrawn, 4 km away
- Amiliya Sand Quarry — environmental approval granted, 4.3 km away
- Amiliya Sand Quarry_9.00 ha — cleared for impact study, 4.7 km away
- Amiliya Sand Quarry_9.00 ha — withdrawn, 4.7 km away
- Construction of 33/11kv sub station Balhaud — lapsed, 4.9 km away
More from Gayaprasad Anjne in Umaria
- Amiliya Sand Quarry_11.00 ha — withdrawn
- Amiliya Sand Quarry_9.00 ha — withdrawn
- Parasi Sand Quarry — withdrawn
- Khairbhar-1 River Sand Quarry — environmental approval granted
- Jhala River Sand Quarry — environmental approval granted
- Bhamrah Sand Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.