Quick answers
What is this project?
This lapsed mining project by M/S Giriraj Stone Crusher, Partner - Shri Ashok Kumar Punia is in Ponri, Deosar, Singrauli, Madhya Pradesh. The site covers 7.4 acres.
Who is building it?
The applicant is Ashok Punia.
Has it been approved?
No. The application was lapsed on 22 Feb 2025, so it is no longer under consideration.
Where is it?
In Ponri, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 1 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Feb 2025 |
| Application filed | 1 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashok Punia |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Ponri |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03991 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Dec 2024 (this page) | Lapsed | 7.4 acres | ₹40 lakh |
| New project filed 14 Sept 2024 | Lapsed | 7.4 acres | ₹40 lakh |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is smaller than 63% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Ponri, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Giriraj Stone Crusher, Partner - Shri Ashok Kumar Punia — lapsed, 0 m away
- Gadariya Stone Quarry — cleared for impact study, 1.4 km away
- Bharsedi Stone Quarry — cleared for impact study, 1.4 km away
- Katheri Stone Quarry — initial checks, 2.7 km away
- Katheri Stone Quarry — cleared for impact study, 2.7 km away
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Sidhi west — forest land use approved, 2.9 km away
- Katheri Stone Quarry — environmental approval granted, 3.2 km away
- Katheri Stone Quarry — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.