Quick answers
What is this project?
Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Sidhi west is an approved telecom project in Bharsera, Deosar, Singrauli, Madhya Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Ramayan Bais.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Feb 2024), as of 27 Nov 2026.
Where is it?
In Bharsera, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹16 lakh; a site of 0.6 acres and 3 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 4 Jun 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 1 Feb 2024 |
| Application filed | 4 Jun 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Ramayan Bais |
| Land area | 2,500 m² |
| Forest land | 3 acres (1.2 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Bharsera |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09954 |
In context
10 applications in Singrauli since January 2022 are in the same category (Telecom): 7 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 0.6 acres, this one is smaller than 80% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharsera, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Giriraj Stone Crusher, Partner - Shri Ashok Kumar Punia — lapsed, 2.9 km away
- Mining project by M/S Giriraj Stone Crusher, Partner - Shri Ashok Kumar Punia — lapsed, 2.9 km away
- Gadariya Stone Quarry — cleared for impact study, 3.6 km away
- Bharsedi Stone Quarry — cleared for impact study, 3.6 km away
- Hardi Sand Quarry — environmental approval granted, 4.1 km away
- Barsedi Sand Deposit — environmental approval granted, 4.3 km away
- Katheri Stone Quarry — initial checks, 5.4 km away
- Katheri Stone Quarry — cleared for impact study, 5.4 km away
More from Ramayan Bais in Singrauli
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route… — forest land use approved
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route DFO… — forest land use approved
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — forest land use approved
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.