Quick answers
What is Capacity Expansion of Existing Fertilizer Unit?
Capacity Expansion of Existing Fertilizer Unit is a proposed industrial project in Jagakheri, Mandsaur, Madhya Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Mexican Agro Chemical Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 May 2024), as of 27 Nov 2026.
Where is it?
In Jagakheri, Mandsaur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹8.1 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 22 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Capacity Expansion of Existing Fertilizer Unit
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 May 2024 |
| Application filed | 22 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mexican Agro Chemical Limited |
| Land area | 2.3 acres (1 ha) |
| Project cost | ₹8.1 crore |
| Village / locality | Jagakheri |
| Taluk / tehsil | Mandsaur |
| District | Mandsaur |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-04184 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 May 2024 | Environmental approval granted | 2.3 acres | ₹8.1 crore |
| Early planning filed 22 Jan 2024 (this page) | Cleared for impact study | 2.3 acres | ₹8.1 crore |
In context
7 applications in Mandsaur since January 2022 are in the same category (Industry): 4 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jagakheri, Mandsaur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Capacity Expansion of Existing Fertilizer Unit — environmental approval granted, 0 m away
- Palewan Stone Quarry; Quarry Lease Area- 1.00 ha, Production Capacity - 8,120… — cleared for impact study, 1.5 km away
- Palevana Stone Quarry — under environmental review, 1.8 km away
- Palevana Stone Quarry — under environmental review, 1.8 km away
- Bhuki (Gitti & M-sand) Quarry — lapsed, 1.8 km away
- Mundadi Stone (Gitti) Quarry-Khasra No.463 — environmental approval granted, 2.9 km away
- Mundadi Stone (Gitti) Quarry — lapsed, 2.9 km away
- Mundadi Stone (Gitti) Quarry — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.