Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 934.7 acres (378.3 ha) |
| Project cost | ₹35 crore |
| Village / locality | Biharganj |
| Taluk / tehsil | Ramnagar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04265 |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 934.7 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Biharganj, Ramnagar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0… — environmental approval granted, 700 m away
- Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II… — environmental approval granted, 4.7 km away
- Expansion in Limestone Production Capacity from 1.2 million TPA to 3.0 million… — lapsed, 4.7 km away
- to obtaining environment clearance for Argat (Part-A) Limestone block Mine… — lapsed, 4.8 km away
- Satna Bansagar 2 Mvs — forest land use approved, 6 km away
- Satna Bansagar 2 Mvs — forest land use approved, 6 km away
- Satna Bansagar 2 Mvs — forest land use approved, 6 km away
- Devdaha Stone Quarry — under environmental review, 6.1 km away
More from UltraTech Cement Limited in Satna
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn
- Atarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production… — under environmental review
- Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production… — cleared for impact study
- Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II… — environmental approval granted
- Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0… — environmental approval granted
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review
14 UltraTech Cement projects in Satna
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.