Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 3 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Avaada Hydrocell Private Limited |
| Land area | 7,072.8 acres (2,862.3 ha) |
| Project cost | ₹4,728 crore |
| Village / locality | Balasgaon |
| Taluk / tehsil | Maheshwar |
| District | West Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04485 |
In context
12 applications in West Nimar since January 2022 are in the same category (Water & irrigation): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 7,072.8 acres, this one is larger than 55% of them.
Where it is
Balasgaon, Maheshwar, West Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nimsar Murram Quarry — under environmental review, 7 km away
- Kalwariya Stone Quarry — lapsed, 8.7 km away
- Astha MP Off-Stream Closed Loop Pumped Storage Project (1200 MW) — cleared for impact study, 9.2 km away
- Maheshwar Janapav Micro Lift Irrigation Project (Underground Pipeline) — under forest review, 10.5 km away
- Indore Water Supply AMRUT 2.0 (Package-I) — more information requested, 12 km away
- Jamnaya Murram Quarry — environmental approval granted, 13.9 km away
- Jamnaya Murram Quarry — lapsed, 13.9 km away
- Maheshwar Janapav Lift Micro Irrigation Project — environmental approval granted, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.