Project details
| Status | Under environmental review |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 21 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Usha nilesh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Nimsar |
| Taluk / tehsil | Maheshwar |
| District | West Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08531 |
In context
175 applications in West Nimar since January 2022 are in the same category (Mining): 106 approved, 19 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nimsar, Maheshwar, West Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalwariya Stone Quarry — lapsed, 4.7 km away
- Omkareshwar Pumped Storage Hydro Project (1200 MW) — lapsed, 7 km away
- Jamnaya Murram Quarry — environmental approval granted, 8.4 km away
- Jamnaya Murram Quarry — lapsed, 8.4 km away
- Astha MP Off-Stream Closed Loop Pumped Storage Project (1200 MW) — cleared for impact study, 13 km away
- Maheshwar Janapav Micro Lift Irrigation Project (Underground Pipeline) — under forest review, 14.1 km away
- Pandyaghat Sand Quarry — environmental approval granted, 14.2 km away
- Mukhtyara Stone Quarry — under environmental review, 14.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.