Quick answers
What is Suliyari Coal Mine (Expansion from 5.0 MTPA to 7.0 MTPA)?
Suliyari Coal Mine (Expansion from 5.0 MTPA to 7.0 MTPA) is an approved mining project in Belwar, Singrauli, Madhya Pradesh. The site covers 3,207.4 acres.
Who is building it?
The applicant is Ap Mineral Development Corporation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Feb 2025), as of 27 Nov 2026.
Where is it?
In Belwar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2,260 crore and a site of 3,207.4 acres.
When was it filed?
The application was filed on 16 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 16 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Ap Mineral Development Corporation |
| Land area | 3,207.4 acres (1,298 ha) |
| Project cost | ₹2,260 crore |
| Village / locality | Belwar |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04660 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,207.4 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Belwar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Suliyari Coal Mine from 6.0 MTPA to 7.0 MTPA (20% Phase II… — lapsed, 0 m away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 2.7 km away
- Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC… — under forest review, 3.4 km away
- Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC… — environmental approval granted, 3.4 km away
- Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC… — environmental approval granted, 4.2 km away
- Bharti Airtel Ltd. 5G OFC Project Adani Enterprises to Mahan Energen limited… — forest land use approved, 6.2 km away
- Gurwani Coal Block — under forest review, 6.3 km away
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — lapsed, 6.4 km away
More from Ap Mineral Development Corporation in Singrauli
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.