What is this project?
Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal Road Authority Gora-Mada Route Dfo Singrouli is a lapsed road project in Bhalyatola, Singrauli, Madhya Pradesh. The site covers 17.4 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 26 Mar 2024, so it is no longer under consideration.
Where is it?
In Bhalyatola, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 17.4 acres.
When was it filed?
The application was filed on 5 Feb 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Mar 2024 |
| Application filed | 5 Feb 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 17.4 acres (7 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Bhalyatola |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09934 |
In context
27 applications in Singrauli since January 2022 are in the same category (Roads & highways): 6 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 17.4 acres, this one is larger than 75% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhalyatola, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Suliyari Coal Mine (Expansion from 5.0 MTPA to 7.0 MTPA) — environmental approval granted, 2.7 km away
- Expansion of Suliyari Coal Mine from 6.0 MTPA to 7.0 MTPA (20% Phase II… — lapsed, 2.7 km away
- Gurwani Coal Block — under forest review, 3.7 km away
- Dhirauli North Coal Block — lapsed, 4 km away
- Dhirauli North Coal Block — lapsed, 4 km away
- Bharti Airtel Ltd. 5G OFC Project Adani Enterprises to Mahan Energen limited… — forest land use approved, 4.1 km away
- Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC… — under forest review, 4.3 km away
- Dhirauli Coal Mine Project of Opencast cum Underground of 6.5 MTPA (5 MTPA OC… — environmental approval granted, 4.3 km away
More from Jio Digital Fibre Private LTD in Singrauli
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
6 Jio Digital Fibre projects in Singrauli
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.