What is Developing? Open the mapMap

Cleared for impact studyIndustry · Jhabua, Madhya Pradesh

Expansion of Ferro Alloy plant from 13,200 TPA (1 x 7 MVA SEAF) to 39,600 TPA (1 x 9 MVA SEAF & 1 x 12 MVA SEAF) with combination of Si-Mn (not exceeding 26400 TPA), Fe-Mn (not exceeding 13200 TPA), Fe-Cr(not exceeding 6600TPA) and Fe-Si (not exceeding 8400TPA)

Expansion of Ferro Alloy plant from 13,200 TPA (1 x 7 MVA SEAF) to 39,600 TPA (1 x 9 MVA SEAF & 1 x 12 MVA SEAF) with combination of Si-Mn (not exceeding 26400 TPA), Fe-Mn (not exceeding 13200 TPA), Fe-Cr(not exceeding 6600TPA) and Fe-Si (not exceeding 8400TPA) is a proposed industrial project in Phatepura, Meghnagar, Jhabua, Madhya Pradesh. The site covers 23.6 acres. Its stated project cost is ₹266 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Oct 2024).

See it on the live map All projects in Jhabua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion of Ferro Alloy plant from 13,200 TPA (1 x 7 MVA SEAF) to 39,600 TPA (1 x 9 MVA SEAF & 1 x 12 MVA SEAF) with combination of Si-Mn (not exceeding 26400 TPA), Fe-Mn (not exceeding 13200 TPA), Fe-Cr(not exceeding 6600TPA) and Fe-Si (not exceeding 8400TPA) along with new installation of Pig Iron Unit (36000 TPA), Sinter plant (72000 TPA), Coke oven (100000 TPA), Captive Power Plant (9 MW), Cement Plant (25000 TPA) & Electrolytic Manganese Dioxide (3360 TPA)
StatusCleared for impact study
Status since24 Oct 2024
Application filed14 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSmo Ferro Alloys Private Limited
Land area23.6 acres (9.6 ha)
Project cost₹266 crore
Village / localityPhatepura
Taluk / tehsilMeghnagar
DistrictJhabua
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-04674

In context

14 applications in Jhabua since January 2022 are in the same category (Industry): 8 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.6 acres, this one is larger than 71% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Phatepura, Meghnagar, Jhabua, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Smo Ferro Alloys Private Limited in Jhabua

All 5 Smo Ferro Alloys projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.