Quick answers
What is Jagdhar Stone Quarry?
Jagdhar Stone Quarry is a lapsed mining project in Jagdhar, Betul, Madhya Pradesh. The site covers 4.2 acres.
Who is building it?
The applicant is Nitesh Kumar Parihar.
Has it been approved?
No. The application was lapsed on 15 Feb 2025, so it is no longer under consideration.
Where is it?
In Jagdhar, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 1 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Feb 2025 |
| Application filed | 1 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nitesh Kumar Parihar |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Jagdhar |
| Taluk / tehsil | Betul |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04868 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.2 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Jagdhar, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- To Develop Industrial Area/Cluster in Jagdhar — more information requested, 1.7 km away
- Parsodi Khurd Crusher Stone (Gitti) Quarry Lease — environmental approval granted, 3.8 km away
- Parsodi Khurr Stone Quarry Lease — lapsed, 3.8 km away
- To Obtaining Environmental Clearance for Capacity Expansion of Fuel Ethanol… — cleared for impact study, 6.6 km away
- Capacity Expansion Project in Existing Fuel Ethanol Unit and Sugar Unit — cleared for impact study, 6.6 km away
- No Increase in Pollution Load Wrt Capacity Expansion in Fuel Ethanol From 45… — initial checks, 6.6 km away
- Kolgaon Stone Quarry — environmental approval granted, 8.3 km away
- Bothiya Brahamanwada Stone Quarry — environmental approval granted, 8.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.