Quick answers
What is Parsodi Khurr Stone Quarry Lease?
Parsodi Khurr Stone Quarry Lease is a lapsed mining project in Parsodi Khurd, Betul, Madhya Pradesh. The site covers 3.6 acres.
Who is building it?
The applicant is Betul Media And Constructions Private Limited.
Has it been approved?
No. The application was lapsed on 25 Jul 2025, so it is no longer under consideration.
Where is it?
In Parsodi Khurd, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 3.6 acres.
When was it filed?
The application was filed on 25 Jun 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 25 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Betul Media And Constructions Private Limited |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Parsodi Khurd |
| Taluk / tehsil | Betul |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07307 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 3.6 acres, this one is smaller than 64% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Parsodi Khurd, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Parsodi Khurd Crusher Stone (Gitti) Quarry Lease — environmental approval granted, 0 m away
- To Develop Industrial Area/Cluster in Jagdhar — more information requested, 2.1 km away
- Jagdhar Stone Quarry — lapsed, 3.8 km away
- To Obtaining Environmental Clearance for Capacity Expansion of Fuel Ethanol… — cleared for impact study, 4 km away
- Capacity Expansion Project in Existing Fuel Ethanol Unit and Sugar Unit — cleared for impact study, 4 km away
- No Increase in Pollution Load Wrt Capacity Expansion in Fuel Ethanol From 45… — initial checks, 4 km away
- Bothiya Brahamanwada Stone Quarry — environmental approval granted, 5 km away
- Junawani Murrum Quarry — environmental approval granted, 6.3 km away
More from Betul Media And Constructions Private Limited in Betul
- Parsodi Khurd Crusher Stone (Gitti) Quarry Lease — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.