Quick answers
What is Dhudiyanai Stone (Gitti & M-sand) Quarry?
Dhudiyanai Stone (Gitti & M-sand) Quarry is an approved mining project in Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Rajendra Singh Kiledar Constructions Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Feb 2026), as of 27 Nov 2026.
Where is it?
In Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 20 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Feb 2026 |
| Application filed | 20 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendra Singh Kiledar Constructions Private Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Ghudiya Nai |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05656 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 51% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ghudiyanai Stone (Gitti & M-sand) Quarry — lapsed, 0 m away
- Ghudiyanai Stone Quarry — environmental approval granted, 300 m away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 2.8 km away
- Bhivkund Crusher Stone (Gitti & M-sand) Quarry — under environmental review, 3.2 km away
- Construction of New Civil Court Building at Bhainsdehi — lapsed, 6.8 km away
- 4g Saturation Project Under 500 Days Project — lapsed, 7.8 km away
- 4g Saturation Project 500days in Rural India at Kordi — lapsed, 7.8 km away
- Bsnl 4g Saturation Project — lapsed, 8.3 km away
More from Rajendra Singh Kiledar Constructions Private Limited in Betul
- Ghudiyanai Stone (Gitti & M-sand) Quarry — lapsed
- Pipariya Stone Quarry — cleared for impact study
- Pipariya Stone Quarry of M/s RAJENDRA SINGH KILEDAR CONSTRUCTION PVT. LTD. — lapsed
4 Rajendra Singh Kiledar projects in Betul
All 5 Rajendra Singh Kiledar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.