Quick answers
What is Ghudiyanai Stone (Gitti & M-sand) Quarry?
Ghudiyanai Stone (Gitti & M-sand) Quarry is a lapsed mining project in Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Rajendra Singh Kiledar Constructions Private Limited.
Has it been approved?
No. The application was lapsed on 23 Aug 2025, so it is no longer under consideration.
Where is it?
In Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 22 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Aug 2025 |
| Application filed | 22 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendra Singh Kiledar Constructions Private Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Ghudiya Nai |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07390 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 51% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Ghudiya Nai, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhudiyanai Stone (Gitti & M-sand) Quarry — environmental approval granted, 0 m away
- Ghudiyanai Stone Quarry — environmental approval granted, 300 m away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 2.8 km away
- Bhivkund Crusher Stone (Gitti & M-sand) Quarry — under environmental review, 3.2 km away
- Construction of New Civil Court Building at Bhainsdehi — lapsed, 6.8 km away
- 4g Saturation Project Under 500 Days Project — lapsed, 7.8 km away
- 4g Saturation Project 500days in Rural India at Kordi — lapsed, 7.8 km away
- Bsnl 4g Saturation Project — lapsed, 8.3 km away
More from Rajendra Singh Kiledar Constructions Private Limited in Betul
- Dhudiyanai Stone (Gitti & M-sand) Quarry — environmental approval granted
- Pipariya Stone Quarry — cleared for impact study
- Pipariya Stone Quarry of M/s RAJENDRA SINGH KILEDAR CONSTRUCTION PVT. LTD. — lapsed
4 Rajendra Singh Kiledar projects in Betul
All 5 Rajendra Singh Kiledar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.