What is Developing? Open the mapMap

Returned to applicantPower · Narsimhapur, Madhya Pradesh

Gadarwara Super Thermal Power Project, Stage-II (2x800MW)

Gadarwara Super Thermal Power Project, Stage-II (2x800MW) is a proposed power project in Gondijhiria, Gadarwara, Narsimhapur, Madhya Pradesh. The site covers 2,250.4 acres. Its stated project cost is ₹35,550.9 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 20 Mar 2025).

See it on the live map All projects in Narsimhapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusReturned to applicant
Status since20 Mar 2025
Application filed11 Mar 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorPower
ApplicantNTPC Limited (NTPC)
Land area2,250.4 acres (910.7 ha)
Project cost₹35,550.9 crore
Village / localityGondijhiria
Taluk / tehsilGadarwara
DistrictNarsimhapur
StateMadhya Pradesh
Location fromSite area on record
Our referenceWID-MP-05862

In context

7 applications in Narsimhapur since January 2022 are in the same category (Power): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.

Where it is

Gondijhiria, Gadarwara, Narsimhapur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from NTPC Limited (NTPC) in Narsimhapur

3 NTPC projects in Narsimhapur
All 129 NTPC projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.